Works to Trees Protected by a Tree Preservation Order - G6 4 No. Cedar, 1 No. Copper Beach. T8, Weeping Ash, T3 Ash tree - Crown Lift all Trees to 2mts for Security Reasons
Aquatic Control Engineering Limited Retford Road Rampton Nottinghamshire DN22 0FG
4th July 2023
Discharge of Condition 3 (Materials) of P.A. 22/01003/FUL - Extension of Combined Warehouse and Workshop Building with Installation of Roof Mounted Photovoltaic Panels and Formation of Car Parking Area
Elmwood House Treswell Road Rampton Retford Nottinghamshire DN22 0HX
26th June 2023
Demolish Existing Dwelling, Outbuildings and Stables and Replace with New Dwelling (Inc Temporary Caravan During Construction)
The Croft Greenside Rampton Retford Nottinghamshire DN22 0HY
20th June 2023
First Floor Front Dormer Extension and Re Tiling of Existing Roof
Rainbow Cottage Laneham Street Rampton Retford Nottinghamshire DN22 0JX
20th March 2023
Works to Trees Protected by a Tree Preservation Order - 1 x Ash (T1) Crown Reduction 2m Remove Dead Wood, Limb South East 4.2m to be Reduced by 3.5m
Zamara Cottage Laneham Street Rampton Nottinghamshire DN22 0JX
9th February 2023
Erection of Single Storey Side and Rear Extensions to Dwelling
Hall Farm Main Street Rampton Retford Nottinghamshire DN22 0HR
6th February 2023
Change of Use and Alterations To Domestic Ancillary Building to Form Ground Floor Office
Aquatic Control Engineering Limited Retford Road Rampton Nottinghamshire DN22 0FG
10th January 2023
Discharge of Conditions 8 and 9 on P/A on P/A 22/01003/FUL Extension of Combined Warehouse and Workshop Building with Installation of Roof Mounted Photovoltaic Panels and Formation of Car Parking Area
Rose Villa Main Street Rampton Retford Nottinghamshire DN22 0HR
21st November 2022
Detached Garage to Rear and Rear Side Garden Wall
Aquatic Control Engineering Limited Retford Road Rampton Nottinghamshire DN22 0FG
17th November 2022
Discharge of Condition 7 on P/A 22/01003/FUL - Extension of Combined Warehouse and Workshop Building with Installation of Roof Mounted Photovoltaic Panels and Formation of Car Parking Area